{"id":14240,"date":"2025-09-09T07:00:11","date_gmt":"2025-09-09T07:00:11","guid":{"rendered":"https:\/\/cpsconveyors.com.au\/?post_type=news&#038;p=14240"},"modified":"2026-03-26T02:51:42","modified_gmt":"2026-03-26T02:51:42","slug":"delivering-under-deadline-cps-cuts-lead-time-by-over-50","status":"publish","type":"news","link":"https:\/\/cpsconveyors.com.au\/es\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/","title":{"rendered":"Delivering Under Deadline: CPS Cuts Lead Time by Over 50%"},"content":{"rendered":"<p><strong>Faced with a shortened deadline for a conveyor pulley featuring a custom THDD bearing housing, CPS responded by bringing the housing fabrication in-house, delivering the completed unit for Hancock Iron Ore\u2019s Pilbara Project in just 6.5 weeks.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"424\" src=\"https:\/\/wpstaq-ap-southeast-2-media.s3.amazonaws.com\/cps-testserver\/wp-content\/uploads\/media\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54.jpg\" alt=\"\" class=\"wp-image-14241\" style=\"width:656px;height:auto\" srcset=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54.jpg 800w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-300x159.jpg 300w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-768x407.jpg 768w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-18x10.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p>One week after the initial request, the project was escalated to high priority, requiring an accelerated manufacturing and delivery schedule. The custom bearing housing, typically a long-lead item, posed a significant risk to meeting the revised timeline.<\/p>\n\n\n\n<p>By shifting fabrication internally, CPS reduced lead time, controlled quality, and maintained project momentum. This approach also delivered notable cost savings and eliminated reliance on external suppliers.<\/p>\n\n\n\n<p>The bearing housings were finished in pink to support Hancock Iron Ore\u2019s ongoing breast cancer awareness initiatives. This continues CPS\u2019s participation in previous efforts, including a pink belt winder in 2024 and pink conveyor roller flingers across multiple HIO sites.<\/p>\n\n\n\n<p>This project highlights CPS\u2019s capability to respond quickly, solve complex manufacturing challenges in-house, and support client initiatives beyond the technical scope.<\/p>\n\n\n\n<p><strong>Download the full case study below to explore the project in detail.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"600\" data-id=\"14242\" src=\"https:\/\/wpstaq-ap-southeast-2-media.s3.amazonaws.com\/cps-testserver\/wp-content\/uploads\/media\/2025\/09\/2025-07-15-14.22.43.jpg\" alt=\"\" class=\"wp-image-14242\" srcset=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/2025-07-15-14.22.43.jpg 800w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/2025-07-15-14.22.43-300x225.jpg 300w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/2025-07-15-14.22.43-768x576.jpg 768w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/2025-07-15-14.22.43-16x12.jpg 16w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Faced with a shortened deadline for a conveyor pulley featuring a custom THDD bearing housing, CPS responded by bringing the housing fabrication in-house, delivering the completed unit for Hancock Iron Ore\u2019s Pilbara Project in just 6.5 weeks. One week after the initial request, the project was escalated to high priority, requiring an accelerated manufacturing and [&hellip;]<\/p>","protected":false},"featured_media":14243,"template":"","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"news-category":[],"class_list":["post-14240","news","type-news","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CPS Cuts Lead Time by 50% | Fast Delivery<\/title>\n<meta name=\"description\" content=\"CPS cut roller and idler lead times by over 50% to meet a critical client deadline, demonstrating its manufacturing agility and commitment to on-time delivery for mining operations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cpsconveyors.com.au\/es\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CPS Cuts Lead Time by 50% | Fast Delivery\" \/>\n<meta property=\"og:description\" content=\"CPS cut roller and idler lead times by over 50% to meet a critical client deadline, demonstrating its manufacturing agility and commitment to on-time delivery for mining operations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cpsconveyors.com.au\/es\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/\" \/>\n<meta property=\"og:site_name\" content=\"CPS Conveyors | Conveyor Product and Solutions\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-26T02:51:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"424\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo estimado de lectura\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/\",\"url\":\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/\",\"name\":\"CPS Cuts Lead Time by 50% | Fast Delivery\",\"isPartOf\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg\",\"datePublished\":\"2025-09-09T07:00:11+00:00\",\"dateModified\":\"2026-03-26T02:51:42+00:00\",\"description\":\"CPS cut roller and idler lead times by over 50% to meet a critical client deadline, demonstrating its manufacturing agility and commitment to on-time delivery for mining operations.\",\"breadcrumb\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#breadcrumb\"},\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#primaryimage\",\"url\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg\",\"contentUrl\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg\",\"width\":800,\"height\":424},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/cpsconveyors.com.au\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Delivering Under Deadline: CPS Cuts Lead Time by Over 50%\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/cpsconveyors.com.au\/#website\",\"url\":\"https:\/\/cpsconveyors.com.au\/\",\"name\":\"CPS Conveyors | Conveyor Product and Solutions\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/cpsconveyors.com.au\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-CL\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/cpsconveyors.com.au\/#organization\",\"name\":\"CPS Conveyors | Conveyor Product and Solutions\",\"url\":\"https:\/\/cpsconveyors.com.au\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png\",\"contentUrl\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png\",\"width\":270,\"height\":75,\"caption\":\"CPS Conveyors | Conveyor Product and Solutions\"},\"image\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CPS Cuts Lead Time by 50% | Fast Delivery","description":"CPS cut roller and idler lead times by over 50% to meet a critical client deadline, demonstrating its manufacturing agility and commitment to on-time delivery for mining operations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cpsconveyors.com.au\/es\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/","og_locale":"es_ES","og_type":"article","og_title":"CPS Cuts Lead Time by 50% | Fast Delivery","og_description":"CPS cut roller and idler lead times by over 50% to meet a critical client deadline, demonstrating its manufacturing agility and commitment to on-time delivery for mining operations.","og_url":"https:\/\/cpsconveyors.com.au\/es\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/","og_site_name":"CPS Conveyors | Conveyor Product and Solutions","article_modified_time":"2026-03-26T02:51:42+00:00","og_image":[{"width":800,"height":424,"url":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Tiempo estimado de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/","url":"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/","name":"CPS Cuts Lead Time by 50% | Fast Delivery","isPartOf":{"@id":"https:\/\/cpsconveyors.com.au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#primaryimage"},"image":{"@id":"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#primaryimage"},"thumbnailUrl":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg","datePublished":"2025-09-09T07:00:11+00:00","dateModified":"2026-03-26T02:51:42+00:00","description":"CPS cut roller and idler lead times by over 50% to meet a critical client deadline, demonstrating its manufacturing agility and commitment to on-time delivery for mining operations.","breadcrumb":{"@id":"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#breadcrumb"},"inLanguage":"es-CL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/"]}]},{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#primaryimage","url":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg","contentUrl":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg","width":800,"height":424},{"@type":"BreadcrumbList","@id":"https:\/\/cpsconveyors.com.au\/news\/delivering-under-deadline-cps-cuts-lead-time-by-over-50\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cpsconveyors.com.au\/"},{"@type":"ListItem","position":2,"name":"Delivering Under Deadline: CPS Cuts Lead Time by Over 50%"}]},{"@type":"WebSite","@id":"https:\/\/cpsconveyors.com.au\/#website","url":"https:\/\/cpsconveyors.com.au\/","name":"CPS Conveyors | Conveyor Product and Solutions","description":"","publisher":{"@id":"https:\/\/cpsconveyors.com.au\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cpsconveyors.com.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-CL"},{"@type":"Organization","@id":"https:\/\/cpsconveyors.com.au\/#organization","name":"CPS Conveyors | Conveyor Product and Solutions","url":"https:\/\/cpsconveyors.com.au\/","logo":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/","url":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png","contentUrl":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png","width":270,"height":75,"caption":"CPS Conveyors | Conveyor Product and Solutions"},"image":{"@id":"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/"}}]}},"uagb_featured_image_src":{"full":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg",800,424,false],"thumbnail":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1-150x150.jpg",150,150,true],"medium":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1-300x159.jpg",300,159,true],"medium_large":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1-768x407.jpg",768,407,true],"large":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg",800,424,false],"1536x1536":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg",800,424,false],"2048x2048":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg",800,424,false],"trp-custom-language-flag":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1-18x10.jpg",18,10,true],"gform-image-choice-sm":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg",300,159,false],"gform-image-choice-md":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg",400,212,false],"gform-image-choice-lg":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2025\/09\/RoyHill-Pink-Pulley-2025-07-11-14.30.54-1.jpg",600,318,false]},"uagb_author_info":{"display_name":"CPS Conveyors","author_link":"https:\/\/cpsconveyors.com.au\/es\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"Faced with a shortened deadline for a conveyor pulley featuring a custom THDD bearing housing, CPS responded by bringing the housing fabrication in-house, delivering the completed unit for Hancock Iron Ore\u2019s Pilbara Project in just 6.5 weeks. One week after the initial request, the project was escalated to high priority, requiring an accelerated manufacturing and&hellip;","_links":{"self":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news\/14240","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/media\/14243"}],"wp:attachment":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/media?parent=14240"}],"wp:term":[{"taxonomy":"news-category","embeddable":true,"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news-category?post=14240"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}