{"id":15107,"date":"2026-10-29T01:05:16","date_gmt":"2026-10-29T01:05:16","guid":{"rendered":"https:\/\/cpsconveyors.com.au\/?post_type=news&#038;p=15107"},"modified":"2026-10-29T01:07:29","modified_gmt":"2026-10-29T01:07:29","slug":"capacity-increase-on-a-72-primary-crushing-conveyor-belt-using-yeloroll-hd-rollers","status":"publish","type":"news","link":"https:\/\/cpsconveyors.com.au\/es\/news\/capacity-increase-on-a-72-primary-crushing-conveyor-belt-using-yeloroll-hd-rollers\/","title":{"rendered":"Capacity Increase on a 72\u2019\u2019 Primary Crushing Conveyor Belt Using Yeloroll HD Rollers"},"content":{"rendered":"<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN.jpeg\" alt=\"\" class=\"wp-image-15109\" style=\"aspect-ratio:1.6032279757901815;width:909px;height:auto\" srcset=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN.jpeg 1600w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-300x225.jpeg 300w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-1024x768.jpeg 1024w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-768x576.jpeg 768w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-1536x1152.jpeg 1536w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-16x12.jpeg 16w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The challenges facing large-scale mining operations grow alongside their production levels. Faced with a significant increase in the tonnage processed in primary crushing, it became necessary to increase their speed and capacity of a 72\u201d conveyor belt.<br>Given these new operating conditions, the client requested a solution that would improve the reliability, safety, and availability of its conveyor system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Challenge<br><\/strong><br>The increase in production meant transporting a greater volume of ore at a higher speed. As a preventive measure, the mining company conducted an assessment of potential problems that might arise under these new demands.<br><br>One of the main risks identified was the operational limit of the steel rollers installed in the existing loading area, due to their weight and the higher operational loads to which they would be subjected.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The CPS Solution<br><\/strong><br>CPS was invited to develop a proposal for the challenge identified. After evaluating the conditions, it was recommended to install Yeloroll HD rollers, designed to offer high efficiency, lower weight, and greater reliability.<br><br>The solution involved replacing the steel roller with a 40mm shaft with a CPS composite roller featuring a 50mm shaft and a bearing system suited to the new operational requirements.<br><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Weight Reduction<br><\/strong><br>This change reduced the unit weight of the rollers from 29 kg to 21 kg, a decrease of 8 kg per unit, or 27%, and also increased the tonnage and speed in accordance with the new operational requirements.<br><br>The reduced weight facilitates handling during installation and maintenance, while also helping to minimise ergonomic risks for personnel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Results<br><\/strong><br>To date, over 400 Yeloroll HD rollers have been installed in the loading area, yielding the following results:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 Service life of all rollers: over 16 months.<br>\u2022 27% reduction in unit weight.<br>\u2022 Greater reliability despite increased speed and capacity.<br>\u2022 Safer and easier handling during installation and maintenance.<br>\u2022 A weight reduction of more than 8 metric tons on the structure due to the switch from steel to composite material in the rollers used.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Project Development<\/strong><br><strong><br><\/strong>Due to the excellent performance achieved, the client requested that the implementation of Yeloroll HD rollers be extended to the entire loading area.<\/p>","protected":false},"excerpt":{"rendered":"<p>The challenges facing large-scale mining operations grow alongside their production levels. Faced with a significant increase in the tonnage processed in primary crushing, it became necessary to increase their speed and capacity of a 72\u201d conveyor belt.Given these new operating conditions, the client requested a solution that would improve the reliability, safety, and availability of [&hellip;]<\/p>\n","protected":false},"featured_media":15109,"template":"","meta":{"_acf_changed":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"news-category":[],"class_list":["post-15107","news","type-news","status-publish","has-post-thumbnail","hentry"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN.jpeg",1600,1200,false],"thumbnail":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-150x150.jpeg",150,150,true],"medium":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-300x225.jpeg",300,225,true],"medium_large":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-768x576.jpeg",768,576,true],"large":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-1024x768.jpeg",1024,768,true],"1536x1536":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-1536x1152.jpeg",1536,1152,true],"2048x2048":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN.jpeg",1600,1200,false],"trp-custom-language-flag":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN-16x12.jpeg",16,12,true],"gform-image-choice-sm":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN.jpeg",300,225,false],"gform-image-choice-md":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN.jpeg",400,300,false],"gform-image-choice-lg":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2026\/10\/MAIN.jpeg",600,450,false]},"uagb_author_info":{"display_name":"Andrew Charlton","author_link":"https:\/\/cpsconveyors.com.au\/es\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"The challenges facing large-scale mining operations grow alongside their production levels. Faced with a significant increase in the tonnage processed in primary crushing, it became necessary to increase their speed and capacity of a 72\u201d conveyor belt.Given these new operating conditions, the client requested a solution that would improve the reliability, safety, and availability of&hellip;","_links":{"self":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news\/15107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/media\/15109"}],"wp:attachment":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/media?parent=15107"}],"wp:term":[{"taxonomy":"news-category","embeddable":true,"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news-category?post=15107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}