{"id":2793,"date":"2020-09-10T01:11:16","date_gmt":"2020-09-10T01:11:16","guid":{"rendered":"https:\/\/cpsconveyors.com.au\/?post_type=news&#038;p=2793"},"modified":"2026-03-27T06:39:25","modified_gmt":"2026-03-27T06:39:25","slug":"queensland-coal-case-study","status":"publish","type":"news","link":"https:\/\/cpsconveyors.com.au\/es\/news\/queensland-coal-case-study\/","title":{"rendered":"Queensland Coal case study"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2794 size-full\" src=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg\" alt=\"\" width=\"698\" height=\"400\" srcset=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg 698w, https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal-300x172.jpg 300w\" sizes=\"auto, (max-width: 698px) 100vw, 698px\" \/><\/p>\n<h4>In 2018, one of the top 10 producing coal mines in Queensland producing over 8Mtpa had its existing rollers 100% converted to <a href=\"https:\/\/cpsconveyors.com.au\/es\/rollers\/\">CPS Rollers<\/a> to address the undesirable expenses due to failed rollers.<\/h4>\n<p>The performance and failure rates of the installed <a href=\"https:\/\/cpsconveyors.com.au\/es\/rollers\/\">CPS roller<\/a>s were monitored for 12 months and compared to previous rates, demonstrating a<strong> failure rate improvement from 16.10% to 0.41%<\/strong>. This equates to a reduction of roller failures from <strong>739 down to just 19<\/strong>.<\/p>\n<p>The site experienced an uplift in production of <strong>900,000 tonnes<\/strong> across the observed period- at an average price of <strong>$101 per tonnes<\/strong> \u2013 which translates to a production uplift during this period of<strong> $90.9M<\/strong>.<\/p>\n<p>Of this uplift, <strong>750,000 tonnes<\/strong> were directly attributable to improved availability.<\/p>","protected":false},"excerpt":{"rendered":"<p>In 2018, one of the top 10 producing coal mines in Queensland producing over 8Mtpa had its existing rollers 100% converted to CPS Rollers to address the undesirable expenses due to failed rollers. The performance and failure rates of the installed CPS rollers were monitored for 12 months and compared to previous rates, demonstrating a [&hellip;]<\/p>","protected":false},"featured_media":2794,"template":"","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"news-category":[21],"class_list":["post-2793","news","type-news","status-publish","has-post-thumbnail","hentry","news-category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Queensland Coal Conveyor Case Study | CPS<\/title>\n<meta name=\"description\" content=\"CPS case study from a Queensland coal operation covering Yeloroll-HD roller upgrades, noise reduction, weight savings, and improved conveyor reliability in underground mining.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cpsconveyors.com.au\/es\/news\/queensland-coal-case-study\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Queensland Coal Conveyor Case Study | CPS\" \/>\n<meta property=\"og:description\" content=\"CPS case study from a Queensland coal operation covering Yeloroll-HD roller upgrades, noise reduction, weight savings, and improved conveyor reliability in underground mining.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cpsconveyors.com.au\/es\/news\/queensland-coal-case-study\/\" \/>\n<meta property=\"og:site_name\" content=\"CPS Conveyors | Conveyor Product and Solutions\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-27T06:39:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"698\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo estimado de lectura\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/\",\"url\":\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/\",\"name\":\"Queensland Coal Conveyor Case Study | CPS\",\"isPartOf\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg\",\"datePublished\":\"2020-09-10T01:11:16+00:00\",\"dateModified\":\"2026-03-27T06:39:25+00:00\",\"description\":\"CPS case study from a Queensland coal operation covering Yeloroll-HD roller upgrades, noise reduction, weight savings, and improved conveyor reliability in underground mining.\",\"breadcrumb\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#breadcrumb\"},\"inLanguage\":\"es-CL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#primaryimage\",\"url\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg\",\"contentUrl\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg\",\"width\":698,\"height\":400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/cpsconveyors.com.au\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Queensland Coal case study\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/cpsconveyors.com.au\/#website\",\"url\":\"https:\/\/cpsconveyors.com.au\/\",\"name\":\"CPS Conveyors | Conveyor Product and Solutions\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/cpsconveyors.com.au\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-CL\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/cpsconveyors.com.au\/#organization\",\"name\":\"CPS Conveyors | Conveyor Product and Solutions\",\"url\":\"https:\/\/cpsconveyors.com.au\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-CL\",\"@id\":\"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png\",\"contentUrl\":\"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png\",\"width\":270,\"height\":75,\"caption\":\"CPS Conveyors | Conveyor Product and Solutions\"},\"image\":{\"@id\":\"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Queensland Coal Conveyor Case Study | CPS","description":"CPS case study from a Queensland coal operation covering Yeloroll-HD roller upgrades, noise reduction, weight savings, and improved conveyor reliability in underground mining.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cpsconveyors.com.au\/es\/news\/queensland-coal-case-study\/","og_locale":"es_ES","og_type":"article","og_title":"Queensland Coal Conveyor Case Study | CPS","og_description":"CPS case study from a Queensland coal operation covering Yeloroll-HD roller upgrades, noise reduction, weight savings, and improved conveyor reliability in underground mining.","og_url":"https:\/\/cpsconveyors.com.au\/es\/news\/queensland-coal-case-study\/","og_site_name":"CPS Conveyors | Conveyor Product and Solutions","article_modified_time":"2026-03-27T06:39:25+00:00","og_image":[{"width":698,"height":400,"url":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Tiempo estimado de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/","url":"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/","name":"Queensland Coal Conveyor Case Study | CPS","isPartOf":{"@id":"https:\/\/cpsconveyors.com.au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#primaryimage"},"image":{"@id":"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#primaryimage"},"thumbnailUrl":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg","datePublished":"2020-09-10T01:11:16+00:00","dateModified":"2026-03-27T06:39:25+00:00","description":"CPS case study from a Queensland coal operation covering Yeloroll-HD roller upgrades, noise reduction, weight savings, and improved conveyor reliability in underground mining.","breadcrumb":{"@id":"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#breadcrumb"},"inLanguage":"es-CL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/"]}]},{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#primaryimage","url":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg","contentUrl":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg","width":698,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/cpsconveyors.com.au\/news\/queensland-coal-case-study\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cpsconveyors.com.au\/"},{"@type":"ListItem","position":2,"name":"Queensland Coal case study"}]},{"@type":"WebSite","@id":"https:\/\/cpsconveyors.com.au\/#website","url":"https:\/\/cpsconveyors.com.au\/","name":"CPS Conveyors | Conveyor Product and Solutions","description":"","publisher":{"@id":"https:\/\/cpsconveyors.com.au\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cpsconveyors.com.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-CL"},{"@type":"Organization","@id":"https:\/\/cpsconveyors.com.au\/#organization","name":"CPS Conveyors | Conveyor Product and Solutions","url":"https:\/\/cpsconveyors.com.au\/","logo":{"@type":"ImageObject","inLanguage":"es-CL","@id":"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/","url":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png","contentUrl":"https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2023\/08\/CPS-Logo.png","width":270,"height":75,"caption":"CPS Conveyors | Conveyor Product and Solutions"},"image":{"@id":"https:\/\/cpsconveyors.com.au\/#\/schema\/logo\/image\/"}}]}},"uagb_featured_image_src":{"full":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",698,400,false],"thumbnail":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal-150x150.jpg",150,150,true],"medium":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal-300x172.jpg",300,172,true],"medium_large":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",698,400,false],"large":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",698,400,false],"1536x1536":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",698,400,false],"2048x2048":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",698,400,false],"trp-custom-language-flag":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",18,10,false],"gform-image-choice-sm":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",300,172,false],"gform-image-choice-md":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",400,229,false],"gform-image-choice-lg":["https:\/\/cpsconveyors.com.au\/wp-content\/uploads\/2020\/09\/CPS_LinkedIn-Art_Queensland-Coal.jpg",600,344,false]},"uagb_author_info":{"display_name":"CPS Conveyors","author_link":"https:\/\/cpsconveyors.com.au\/es\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"In 2018, one of the top 10 producing coal mines in Queensland producing over 8Mtpa had its existing rollers 100% converted to CPS Rollers to address the undesirable expenses due to failed rollers. The performance and failure rates of the installed CPS rollers were monitored for 12 months and compared to previous rates, demonstrating a&hellip;","_links":{"self":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news\/2793","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/media\/2794"}],"wp:attachment":[{"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/media?parent=2793"}],"wp:term":[{"taxonomy":"news-category","embeddable":true,"href":"https:\/\/cpsconveyors.com.au\/es\/wp-json\/wp\/v2\/news-category?post=2793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}