CPS Brings the Next Generation of LLM Rollers to the Maxwell Malabar Mine
Posted at October 20, 2026
As part of a complex engineering challenge in the Upper Hunter valley, CPS was called upon to revolutionise our idler designs.
The Maxwell Malabar Coal Mine is the largest mettalurgical coal mine in NSW, and to support this massive operation, ACE and CPS, alongside the rest of the Fenner Portfolio, were called upon to design, manufacture, and install a 9km Overland Conveyor system, creating the key link between the mine and the coal processing plant.
The Challenge
The layout and design of overland conveyors are dictated by several unique factors, including the constraints of the local topography, environmental impact considerations, and the desire to minimise infrastructure across the conveyor’s length.
In the case of the Malabar overland conveyor system, the team were faced with many such challenges, including topographical issues, limited access for power, roads, and other utilities.
Principal Engineer at ACE, Taylor Jobson, said that this “constrained geometry”, which featured vertical and horizontal curves across its length required careful planning and several design iterations to ensure optimal functionality while keeping costs in check.
When it comes to overland conveyor systems, the belt will typically be the most expensive and power hungry component, and therefore it was critical that the entire system’s design be approached with an overaching philosophy aimed at achieving best in class frictional coefficient losses.
From the CPS perspective, this came in the form of the design, manufacture and installation of 12,000 low-noise Australian-made CPS composite rollers and next-gen low-level idler modules (LLM), spanning all 9km of the overland terrain, and 22 horizantal or vertical curves.
The Solution
As part of this project, CPS committed to revolutionising our Low Level Module (LLM) designs past the limitations of tradition LLM designs.
Advances made with the Hunter Valley LLMs:
- Integrated Return Idler Brackets with H frame module structure reducing overall steel member and complexity.
- Consolidated all banking design variations into a single carry idler and H frame type, significantly reducing complexity over the whole project from engineering and fabrication to installation.
- Ensured compliance with Australian standards in terms of structural design, including AS4100 and AS1170.2.
- In-depth fatigue analysis of the critical components including H and idler frames and threaded bar support legs to ensure structural integrity of the required design for the life of the plant.
Outcomes
After over 97,672 hours of on-site construction, the site installation has now been completed, and the system has been left in the capable stewardship of on-site Fenner technicians.
The system is a showcase of the Fenner Conveyors’ portfolio’s capability for custom built, tailored solutions, and CPS’s ongoing commitment to innovation and improvement on all our products.