Project Library

For years, CPS has been at the forefront of delivering innovative solutions that seamlessly integrate into diverse industries, setting new standards for efficiency, reliability and sustainability. With a track record of excellence and a commitment to delivering cutting-edge conveyor systems, CPS’ projects represent the pinnacle of technological advancement in the bulk materials handling industry. 

Recently Completed Projects

Overland Projects

Far West Hub Bigge

Far West Hub Bigge

Owner/Operator: FMG
Date: 2021
Rollers: 22,861
Frames: 5.403

CPS designed and manufactured idler assembly rollers and frames for the FMG Far West Hub CV10 relocatable overland conveyor system, located in the Pilbara region of Western Australia.

West Angelas

West Angelas

Owner/Operator: Rio Tinto Iron Ore
Date: 2020
EPCM: Worley
Rollers: 19,000
Frames: 6,600

CPS designed and manufactured high tolerance, cost-effective overland conveyor system for the West Angelas deposit on time and in budget.

South Flank

South Flank

Owner/Operator: BHP Iron Ore
Date: 2019
EPCM: Fluor/BHP
Rollers: 74,000
Frames: 24,400

CPS designed and manufactured BHP’s South Flank overland conveyor idler systems. With a combination of high-tolerance idler frames and composite roller technology, CPS has delivered one of the most advanced, reliable, and cost efficient overland conveyors in the world.

Silvergrass Project

Silvergrass Project

Owner/Operator: Rio Tinto Iron Ore
Date: 2017
EPCM: RCR Tomlinson
Rollers: 19000
Idlers: 6000

Silvergrass is a satellite deposit located adjacent to Rio Tinto’s Nammuldi mine and is part of the Greater Nammuldi precinct, approximately 70km north-west of Tom Price. The project included multiple 900 – 1800mm wide conveyors with frames of ±0.5mm tolerance after galvanising.

Jimblebar Project

Jimblebar Project

Owner/Operator: BHP Iron Ore
Date: 2016
EPCM: Sedgman Civmec Joint Venture
Rollers: 17000
Idlers: 5400

The Jimblebar iron ore mine is located 40km east of Newman in the Pilbara region of Western Australia. The project included multiple 1600–2400mm wide conveyors with frames of ±0.5mm tolerance after galvanising.

International Projects

FQM Minera Panama

FQM Minera Panama

Owner/Operator: First Quantum Minerals LTD
Date 2018
EPCM: Lycopodium
Rollers: 60000
Idlers: 20000

Cobre Panama is a large open-pit copper development project in Panama. The concession is located 120km west of Panama City and 20km from the coast of the Caribbean Sea. The project included multiple 600 – 2600mm wide conveyors.

Ok Tedi Mining Crusher Replacement Project

Ok Tedi Mining Crusher Replacement Project

Ok Tedi Mining Crusher Project – GRES 2019

  • 2,000mm conveyor Idler package
  • Delivered in 14 weeks.

Other Projects

Iron Ore Facility

Iron Ore Facility

  • Product: Polyurethane Disc Rollers
  • Material: Iron Ore
  • Bulk 10,000 Tonnes Per Hour
  • Result: Lower Life Cycle Cost; approximately 30% of the LCC of steel rollers
Queensland Coal

Queensland Coal

  • Yeloroll Carry – 3757
  • Impact Idlers – 519
  • PU Returns & Weightometer – 313
  • Total Installation – 4589
Talison Lithium Project

Talison Lithium Project

Talison Lithium Project – MSP 2018

  • Multiple conveyors 600 – 1,800mm wide.
  • Idler and pulley package delivered in 20 weeks.
Gruyere Gold Project

Gruyere Gold Project

Gruyere Gold Project – Amec Foster Wheeler Civmec JV – 2018

  • Multiple conveyors 600-1800mm wide.
  • Idler package delivered in 16 weeks.
Dugald River Project

Dugald River Project

Dugald River Project – RCR / MMG 2017

  • Multiple conveyors 750-1000mm wide
  • Idler package delivered in 16 weeks
Nova Nickel Project

Nova Nickel Project

Nova Nickel Project – GRES 2015

  • Multiple conveyors 750-1000mm wide.
  • Idler package delivered in 14 weeks.
Shark Bay Salt Expansion and Refurbishment Project

Shark Bay Salt Expansion and Refurbishment Project

  • Multiple conveyors 800, 900,1000mm wide
  • Idler package delivered in 15 weeks
Onslow Salt Expansion and Refurbishment Project

Onslow Salt Expansion and Refurbishment Project

  • Multiple conveyors 800-1500mm wide.
  • Idler package delivered in 14 weeks.

Download our
Project Supply Model Experience

See the CPS range of manufactured conveyor equipment and engineering solutions.

Our Clients.

CPS acknowledges the Traditional Owners of Country throughout Australia and recognises the continuing connection to lands, waters, airways and communities.

We pay respect to Aboriginal and Torres Strait Islander cultures; and to Elders past and present.

Scroll to Top